In mid-May, the north end of Peach Avenue, between the lakefront and Second Street, will be repaved. Erie Blacktop has been contracted to do the work. The existing pavement will be ground down before work begins. In addition, the road will be inverted to drain properly.

The road needed fixed after multiple construction projects and years of use. This small section of roadwork is equivalent to the work that needs to be finished on all 9 miles of road throughout Lakeside.

The following Lakeside families are helping fund this project:  Bob Brucken, Greg and Darby Buehler, Bill and Mame Drackett, Jim and Susan Hoyer, Barbara McGonagle and Bill Roberts, Phil and Betsey Savage, and Bill and Celeste Williams.