Please read the information below to plan your trip to Lakeside this fall. The start date of the State Route 163 roundabout project is Tuesday, Sept. 6, 2022, with a weather-permitting, projected completion date of Nov. 15, 2022. Traffic will be maintained on SR 163 in a single bi-directional lane with temporary traffic signals. There will also be a temporary traffic signal located at N. Riedmaier in timing with the SR 163 temporary signals during construction.

Below is a summary of the construction and detours:

  • The southern half of the SR 163 roundabout and Englebeck Rd. will be the construction area while traffic is maintained as described above on the northern half of SR 163. Englebeck Rd. will be closed at SR 163. The Englebeck Rd. detour is Bayshore Rd. or Quarry Rd. to Bayshore or Church Rd. to Bayshore.
  • The northern half of the SR 163 roundabout and N. Shore Blvd. will be the construction area while traffic is maintained as described above on the southern half of SR 163. N. Shore Blvd. will be closed at SR 163. The detour will be SR 163 to Erie Beach Rd.
  • Access to Mutach’s and Dollar General will be maintained throughout construction.

The link below provides information, answers to frequently asked questions, and a video that explains how to drive a roundabout. The first YouTube video ,‘Roundabout Rules 1 – Single Lane Roundabout,’ is what will be constructed in Danbury Township. transportation.ohio.gov/about-us/basics/roundabouts

View the proposed roundabout design showing eight streetlights, with LED lighting.